Pool construction, step by step.
A new pool starts with design and permits. Follow the sequence through the shell, tile, deck and finish to filling and startup.
For project photographs, explore the before-and-after gallery. For design choices and the pool planner, visit new pool construction.
From design to startup.
These are the stages of a new pool project. The features and accessories for your property are set out in the agreed scope.
- Pool design
- Permit process
- Excavation
- Steel
- PlumbingEquipment electrical and the heater gas line are run at this phase.
- Shotcrete pool shell
- Coping
- Waterline tile
- Pool deck installationPavers or concrete.
- Backyard accessoriesBarbecue, firepit or other agreed accessories.
- Pool equipment installation
- Interior finishPlaster or pebble.
- Fill with water
- Startup and handoverCPR handles the initial two weeks of startup. You then arrange a maintenance technician to continue it.
Turn your ideas into an estimate.
Think about the pool shape and size, whether you want a spa, and the decking or backyard features you have in mind. Use the planner to collect those ideas, then discuss the property and written scope during your in-person estimate.
Tell us about your pool.
Thinking about a project of your own? We look at every pool in person.